Pexo enterprises ltd

Power generator, delivered in container type housing, fueled with gas delivered from the bedcoal methane utilization station, together with the necessary infrastructure for its operation in coalmine. Requirements for power generator and monitoring is: a) Electrical power: 1800 -2000kW b) Thermal power: not less than 1800kW Details available on request.

Featured Products
All Products
>>>>>>>>